Installed power: 30 MW in each farm
Wind turbines: 15 in each farm
Start of concession: August 2012
End of concession: August 2047
Location: Rio Grande do Norte (RN)
Installed power: 32.9 MW in each farm
Wind turbines: 14 in each farm
Start of concession: September 2014
End of concession: September 2049
Location: Rio Grande do Norte (RN)